Experienced for 40 years make us know what customer needs
Explore
About us
Experienced for 40 years, PT. Hasta Karya Perdana had finished many electrical infrastructure projects in many area in Indonesia like Substation, Gas Insulated Switchgear, high voltage overhead line, extra high voltage overhead line, 150 kV or 70 kV Transmission, and Transformers.
PT. Hasta Karya Perdana has done many project in Indonesia, some of them is still going untill right now. The project consist of Gas Insulated Switchgear and High voltage substation
Substation
GI Bukuan
150 kV
GI Bukuan 150 kV, owned by PT. PLN (Persero) UIP Kalbagtim
Substation
GI ARJASA
150 kV
GI Arjasa 150 kV, owned by PT. PLN (Persero) UIP JBTB1
Substation
GI Sebrang Barito
150 kV
GI Sebrang Barito 150 kV, owned by PT. PLN (Persero)
Substation
GI Balikpapan
150 kV
GI Balikpapan 150 kV, owned by PT. PLN (Persero)
Gas Insulated Switchgear
GIS BLIMBING
150 kV
GIS Blimbing 150 kV, owned by PT. PLN (Persero) UIP JBTB1
Gas Insulated Switchgear
GIS Kembangan II
150 kV
GIS Kembangan II 150 kV, owned by PT. PLN (Persero)
Gas Insulated Switchgear
GIS Tanah Lot
150 kV
GIS Tanah Lot 150 kV, owned by PT. PLN (Persero)
Gas Insulated Switchgear
GIS Duren Tiga
150 kV
GIS Duren Tiga 150 kV, owned by PT. PLN (Persero)
Hight Voltage Transmission Line
SUTT SUKAMARA
150 kV
SUTT SUKAMARA 150 kV, owned by PT. PLN (Persero) UIP KALBAGTENG